Control limits are indicators of the disparity in the performance of an operation. This is the real time value on which the process is operating. Specification limits on the other hand are the targets or goals set for the products or the process by the market performance, as an internal target, or even by the customers. In other words, this is the anticipated outcome on the measured metric. The major difference between the control limits and the specification limits is in the outcome of a process.
The city lacks a comprehensive source of data on tall buildings: “This project compiled a database with information about all buildings 240 feet or taller.including building location, height, occupancy, age, construction material, structural system, year, and foundation type. Following the completion of this project, the City will need to develop a mechanism for maintaining or expanding the database.”. The city should apply the inspection, evaluation, and repair provisions of the San Francisco Existing Building Code as applicable to pre-1989 welded steel moment frames.”. Seismic isolation of tall buildings in the world. Prior to the creation of this database, the City had no centralized, searchable repository with this information about all tall buildings in its jurisdiction.
Specifications outline the permissible deviation from nominal or target. However, to really comprehend this, ‘permissible deviation,’ ‘nominal’ and ‘target’ has to be defined.
The particular level or state we are trying to aim for is known as the target or the goal; what is right is the nominal. Usually, the nominal and the target are the same but this doesn’t happen all the time thus, the control limits and specification limits. For instance, if we decide to fill cereal boxes, the nominal is the net weight which is printed on the box as we don’t want to give out cereal for free. However, on the other hand, everyone knows there will always be variation and if our target is the net weight, there is likelihood of finding some boxes that are lesser than the net weight and this can result in the payment of substantial fines. If that be the case, the target of the process is then set to be higher above the nominal so that there would be no box lesser than the net weight.
How the Nominal is Determined
For the control limits and specification limits, the proper nominal is that point in which there is a minimum loss to manufacturer and also to the end user (the customers). However, if this calculation proves difficult to perform, this just means that it isn’t usually done and then the supplier winds up getting the nominal based on the internal losses or by simply making use of the industry standard nominal.
The permissible variation of the nominal is typically based on losses. The specification limits have to be placed at the points in which the loss resulted from the variation (at the customer, end user and the supplier) is equivalent to the advantage of the product. Most times, the specifications are solely based on whatever the variation the subsequent operation can endure. Unfortunately, because the total losses aren’t considered, the specification limits are usually too loose or too tight and therefore costs the society countless billions of dollars.
Control limits are majorly based on previous performance. They tell you the certain inconsistencies the process has previously made with the aim of identifying if adequate change has happened in the past to justify modifying the process. There is a chance that a process does not have the capability to meet a certain specification while also being in statistical control; in this case, there is likelihood of producing items out of spec.
Furthermore, increase in variability is resulted from modifying a process which is in control. If an incapable process is in control, then modifying the process whenever it goes out of specification would really increase the variability as time goes on, therefore making it more difficult to meet the specs.
In other words, specifications are what are promised to the customers and this should be centered on the whole system losses. Control limits express the range of changeability that is expected from the process and these limits are based on real process outcome. And process variability impacts the whole loss of the process, the specification limit does not in any way affect the control limits.
Differences Between Control Limits and Specification Limits
The following are the disparities between control limits and specification limits;
Control Chart Constants, where did the A2 and E2 constants come from?
In statistical process control (SPC) charting, we use the A2 and E2 constants to calculate control limits for an Average (X-bar chart) and Individuals charts. But where do the A2 and E2 constants come from? Let’s look at the following example, for an X-bar chart, that will explain how we derive the A2 constant.
The Generalize Control Limit Equation for Variable Charting
The expression used to compute the control limits for an X-bar chart is:
General Control Limit Equation
In this expression parameters μ, σ, and n represent the mean, standard deviation, and sample size. The expression, σ/√n is also called the standard error of the mean.
Control Chart Constants – X-bar Chart
When using an X-bar Chart we collect several consecutive samples of size, n, to form a homogeneous subgroup and compute a subgroup average. Once we have a enough subgroups, say 30 or more, we can estimate the population average. To do so, we compute the average of the subgroup averages. We call this estimate of the mean X-double bar. The modified expression appears below.
Next we need to estimate the standard error of the mean. Recall in a earlier post (Estimating Gage Repeatability Using Range Statistics), I showed you how to estimate the standard deviation using the average range from the following expression.
Estimating the Standard Deviation Using the Average Range
Using the Average Range to Est. Std Dev.
To estimate the standard deviation we compute the range for each subgroup. Recall the range is the difference between the smallest from the largest value. Once we have the range for each subgroup we then calculate the average range and divide by the d2 constant. To learn more about the d2 constant read the following post (Range Statistics and the d2 Constant).
Control Limit Equation for X-bar Chart
We can now substitute equation (3) into equation (2) to get equation (4) as shown below.
We now have the final equation to compute the control limits for the X-bar Chart based on the average range (R-bar). Take special notice of the expression 3/d2√n. This is the A2 constant.
Control Chart Constants – A2
The A2 constant is a function of the sample size n. Once we know the sample size, n, we can find the value for d2 and compute the value for A2.
Control Chart Constants for A2 at n=5, n=7
Let’s assume that we want to build control limits using a sample size of n=5. In this case the d2 constant is d2=2.326. Substituting these values into equation (5) we have:
Let’s assume that we want to build control limits using a sample size of n=7. In this case the d2 constant is 2.704. Substituting these values into equation (5) we have:
Control Chart Constants – A2 for n=7
Control Chart Constants Depend on d2
Control limits for the X-Bar and Individuals Charts use A2 and E2 constants. In both cases we need the d2 constant. Without it we cannot estimate the control limits using equation (4). To learn more about the d2 constant and how you can derive the d2 constant read the following post Range Statistics and d2 Constant – How to Calculate Standard Deviation.
Control Chart Constants for A2 at n=2 thru n=7
In Table 1, shown are the d2 and A2 constants for various samples sizes, n=2 through n=7. We can use these d2 and A2 values to calculate the control limits for the X-Bar Chart.
Control Chart Constants – Individuals Chart
Let’s apply this new-found knowledge to derive the E2 constants used to compute the control limits for an Individuals Chart. When using an Individuals Chart the subgroup sample size is n=1. In this case, we can change equation (4) and use the following expression shown in equation (6).
Control Limit Equation Individuals Chart Microsoft foundation classes for c++.
Since n=1, notice that the sample size, n, does not appear in equation (6). Take special notice of the expression 3/d2. This is the E2 constant.
Control Chart Constants – E2
Because d2 is a function of the Average Moving Range (MR-Bar), we often compute MR-Bar based on a Moving Range of MR=2. For example, the first moving range (MR1) is the absolute value of the difference between the 1st and 2nd values. Likewise, the second moving range (MR2) is the absolute value of the difference between the 2nd and 3rd values and so on.
We can also compute MR-Bar based on a Moving Range of MR=3. In this case, the first moving range (MR1) is the absolute value of the difference between the 1st and 3rd values. Likewise, the second moving range (MR2) is the absolute value of the difference between the 2nd and 4th values and so on.
Control Chart Constants – Individuals Chart
Let’s assume that we want to build control limits using a Moving Range=2. In this case the d2 constant is d2=1.1.128. Notice this is the same d2 constant used for a subgroup size of n=2. Substituting this value into equation (7) we have:
How To Calculate Control Limits For X-bar Chart
Control Chart Constants -E2 for MR=2
Let’s assume that we want to build control limits using a Moving Range span of 3 values. In this case, we use the d2 constant for a sample size of n=3 which is 1.693. Notice this d2 value is the same used for a subgroup size of n=3 for an Xbar chart. Substituting this value into equation (7) we have:
Control Chart Constants for E2 at MR=2 thru MR=5
In Table 2, shown are the d2 and E2 constants for various Moving Ranges, n=2 through n=7. We can use these d2 and E2 values to calculate the control limits for the Individuals Chart.
Table 2: d2 and E2 Control Chart Constants
This post on Control Chart Constants is a subset of the broader topic of Statistical Process Control Charting. To learn more about Control Charts, please refer to the following link: What are Control Chart?
Control Chart Constants Explained!
So if you ever wondered where the A2 and E2 constants came from – now you know! I trust you enjoyed this post on Control Chart Constants.